Copyright 2023, VDOT. Clearly the pipe needs to function as a conduit, as the whole idea of a pipe is to move liquid in a controlled manner and direction. 2016v1.0 Chapter 4 7, 10 General procedures for pipe installation: 1) Locate utilities 2) Excavate trench 3) Explore foundation INSTALLATION PROCEDURES 4) Place structural bedding material to grade. 4 in.) When joining pipe: Begin at the downstream end (Bell faces upstream) Ensure spigot and bell are clean and free of debris Properly lubricate spigot and bell with pipe lubricant Is Contractor aware of the maximum insertion angle? 5) True or False. 0 We also encourage you to contactJ. R. Noble at [email protected] to sign up for the MCS Managers report, which is offered to help you better track and manage progress throughout the year. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works, SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Construction loads often exceed design loads. The behavior of a material where the material deforms under load and does not go back to its original shape is called plasticity. VDOT: Soils and Aggregate Compaction. 17) What is the minimum amount of cover over pipe allowed for design loads? Single Offset: This joint first appeared in the early 1990 s. This style of spigot is much easier to manufacture. SECTION 02630 STORM DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. If vibratory rollers are used in the backfill operations, vibratory motors shall not be activated until at least 3 feet of backfill has been placed and compacted over the pipe. endobj Contractor shall ensure that all permits are obtained prior to any construction. 1.02 REFERENCES, PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. Debris in the pipe Coatings free of cracks, scratches and peeling Cracks (longitudinal and circumferential) Spalls and Slabbing For metal and plastic pipe localized buckling, bulging, cracking at bolt holes, flattening, or racking, etc. Students must bring valid ID & attend class in order to test. Explore Foundation A stable foundation must be provided to ensure proper line and grade is maintained. Lime is used with soil to add strength to the mixture, to raise the pH of the mixture, to assist in drying out soils, and to reduce soil plasticity. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. This type of joint provides a leak resistant joint when a profile gasket is used. VDOT Soils and Aggregate Compaction: Chapter 3. The current deadline to have Soils and Aggregate Proficiency exams completed by is . All materials, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices, CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. Fine particles are more sensitive to the presence of water than coarse particles. Study with Quizlet and memorize flashcards containing terms like What are the three differences between the AASHTO T-99 and AASHTO T-180?, How many layers of soil are required to make a standard proctor mold? AASHTO M 145 The Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes. Description This section includes materials, testing, and installation of precast concrete, SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. Get the free VDOT Soils and Aggregate Compaction Description . 71 terms. For all roadway projects that are constructed by private contractors for VDOT and for all roadway projects constructed by others that are or will be proposed to be accepted into the VDOT highway system, a visual/video camera post installation inspection is required on all storm sewer pipes and for a selected number of pipe culverts in accordance with the instructions contained in this VTM and Section of the VDOT Road and Bridge Specifications. Natural ground slope, PIPE INSPECTION AND REPAIR. Submit, SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. 12) Backfill is usually placed loosely and heaped above the finished level. This site uses cookies to enhance site navigation and personalize your experience. Try Now! 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. 57 stone is not required; seat stone in trench. kYPPc^KZ\"}JT9VBd[ /Le UJs]VOk:SZ When planning a pipeline installation, there are 2 key functions that we must design the pipeline to provide. STORM SEWERS. 7-1 7.2. hYoF#4rPzL@]Gb)3d@pa@sc/IK^0@Qq. 2016v1.0 Chapter 4 4, 5 PRE CONSTRUCTION ISSUES Prior to construction the pipe delivered to the project should be inspected and verified to be the pipe specified for the project. Fill Vdot Soils And Aggregate Compaction, Edit online. Your one-stop source for VDOT maps, data and project info. Cleaning, Inspecting, and Testing Sanitary Sewers B. 5.01 Design, PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO), TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe. Soils and Aggregate Compaction Technician MARTCP. The video tape/dvd/digital photographs should be of such clarity, detail and resolution as to clearly show the conditions of the interior of the pipe/culvert and detect any defects within the pipe or culvert as specified herein. Additional temporary fill is needed to protect the pipe from construction loads. Grade Adjustment of Existing Miscellaneous Structures 600-8 3. Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. In construction, this is a significant part of the building process. Repair of service laterals located, Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for, SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete, REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502), Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Screen the sample over a 3/4-inch sieve and replace the aggregate retained with an equal weight of No. Pipe Culverts 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes 600-5 2. Section Procedures) When lift holes are provided in concrete pipe or precast box culverts, the Contractor shall install a lift hole plug furnished by the manufacturer. eG%\!9]y7WS{t m+zVjO!s[tG{y Q3@CJY1 9&. 2 0 obj How heavy should the hammer be? Pollution Prevention Field Guide for Construction Activities. In the top 5 feet; perform one test every other lift around the perimeter and continue to the top of the structure. 5) Install pipe to grade 6) Compact structural bedding outside the middle third of the pipe 7) Place structural bedding in lifts 8) Complete structural backfill operation by working from side to side of the pipe, differential not to exceed 24 or 1/3 size of pipe. The proctored 1 hour, 1-on-1 proficiency test is required to fully complete the VDOT Soils & Aggregate Compaction certification. The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. Silt and clay are made up of particles smaller than the No. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. 2016v1.0 Chapter 4 10, 11 Place Bedding Stable and uniform bedding must be provided for the pipe and any protruding features of its joints and/or fittings. True or false: A soil that contains a high percentage of fines is more affected by water that one with a low percentage of fines. CON 310 Soils and Aggregates (Soils and Compaction) Homework Name:_____ 1) Why is it important for material testing technicians understand how to perform both the nuclear density test and the sandcone test for compaction testing? Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. SUMP DRAINS 7-3 7.3. If you have questions, please provide us with the course title and number when e-mailing or calling. Other sets by this creator. Rigid pipe properly fitted, sealed with rubber, preformed plastic, mastic gaskets Flexible Pipe properly aligned and joined with approved coupling bands Joint Performance Terminology Soil Tight: A joint that is resistant to infiltration of particles larger than those retained on the No. Community College Workforce Alliance | The Mission of CCWA is to meet . bc the dense gradation provides more strength by filling voids. 794 (d), please call 800-367-7623. 57 stone can be used as a backfill in the sub foundation. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or, Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. For more information about taking the . Verifying that the correct pipe has been delivered for the applications on your project. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. 402.02. 2016v1.0 Chapter 4 11, 12 Types of Joints for Concrete Pipe Tongue & Groove: A bell & spigot type joint with straight walls (flush bell). This zone contains the same select quality backfill material as in the haunch zone for flexible pipe. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth. stream Excavate Trench Proper trench widths will allow for proper compaction alongside the pipe. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. 1.02 REFERENCE, CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. 7) What is the maximum height of cover for a 48 inch pipe diameter Class IV concrete pipe culvert? SECTION LS 2530 SANITARY SEWERS. TABLE OF CONTENTS. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Another option with the flared bell is the Modified Tongue & Groove, or Baby Bell which is a cross between a straight walled T&G and a Standard Bell it does not stick out from the barrel as far as a flared bell. Virginia Department of Transportation documents: Road and Bridge Specifications and appropriate supplemental specifications Virginia Test Methods Manual Road and Bridge Standards. SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel, SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. OPEN CHANNELS 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT, SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix E | 9 xZKs2>Ip P7[Sq9FoLLmJgl~K"5JtB2+!765nt-8\Gf._o{}E False. 1. A drained pavement structure has a higher bearing capacity that can effectively support traffic loadings, and lead to long lasting pavement at the least maintenance cost. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. (test every other 4 in. Rock more than 2 inches in its greatest dimension shall not be placed within 12 inches of pipe. Schedule PH (Form 1120) (1960). 2. Shop drawings, 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction, SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Unsuitable or unstable foundations may be undercut and replaced with a suitable bedding material, placed in 6 lifts. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Additionally, a copy shall be furnished to local VDOT Asset Management personnel to document the pipe/culvert condition at that point in time.